KNX System Reconstruction & Refurbishment

Primary Focus KNX system reconstruction and refurbishment
Expected Outcome A legitimate, professionally structured KNX installation with improved touchscreen functionality and system maintainability.
KNX project reconstruction Touchscreen replacement Interface configuration refinements

Project Snapshot

  • Location Saadiyat Island, Abu Dhabi, UAE
  • Scope Existing KNX system reconstruction, touchscreen replacement, and configuration refinements
  • Systems KNX automation, ETS project configuration, KNX touchscreen interfaces

TwinTech was commissioned to refurbish the existing KNX automation system at a private villa on Saadiyat Island, Abu Dhabi. The original KNX project had been developed using an unlicensed ETS project file. TwinTech reconstructed the project file, reorganizing the existing configuration into a properly licensed and maintainable project. This provides the owner with a more reliable foundation for future system modifications, servicing, and maintenance.

As part of the refurbishment, TwinTech replaced a faulty KNX touchscreen, restoring centralized control functionality through a newly installed unit. The existing touchscreen interfaces were also reviewed and refined, with parameter sequences and slide ordering reorganized to improve consistency and usability.

Through project reconstruction, hardware replacement, and interface refinement, TwinTech brought the villa's automation installation to a more professional and maintainable standard while preserving the functionality of the existing system.